PROJECT DESIGN DOCUMENT (PDD)

Title of the project activity

BARBAROS WIND POWER PLANT PROJECT 12MW

Version number of the PDD

01

Completion date of the PDD

26/08/2016

Project participant(s)

VERIM ENERJI YATIRIM ÜRETIM VE TIC. A.Ş

Host Party

TURKEY

Applied methodology(ies) and, where applicable, applied standardized baseline(s)

AMS-I.D.”Grid Connected Renewable Electricity Generation, version 18, EB 81, Annex 24, 28 Nov 2014

Sectoral scope(s) linked to the applied methodology(ies)

Energy Industries/Renewable Energies/Wind Energy/Grid Connected1

‘AMS-I.D.”Grid Connected Renewable Electricity Generation, version 18’


Estimated amount of annual average GHG emission reductions

24072.43 t CO2/per year2

    1. Description of project activity

      1. Purpose and general description of project activity


Since renewable energy sources use local sources, they are sustainable, providing energy safety as well as being harmless to the environment locally, nationally and globally. They do not pollute the air, water or land.
In order to contribute to the electricity generation of our country and to popularize electricity generation from wind energy which is considered as one of the most important technologies among the renewable energy resources, Verim Enerji Yatırım Üretim ve Tic. A.Ş. has been granted electricity generation license from EMRA for Barbaros WPP project on 28.06.2012.
Barbaros Wind Power Plant Project pursues both to contribute to providing energy needs of Turkey and to create local industry as well as providing employment. Barbaros Wind Power Plant Project is located in Tekirdağ province, Şarköy district of Turkey and has the installed capacity of 12 MW. Estimated completion date of the entire project is mid-2016. Power plant will include 3 turbines with 3200 kW unit capacity and 1 turbine with 2850 kW unit capacity. Annual electricity generation is calculated as 42.000.0003 KWh which will be transmitted to the national substation at Tekirdağ transformer station through the Asya-Port Distribution Station. Barbaros WPP will provide employment to the project region in terms of qualified staff such as engineers, technicians and machine operators as well as regular personnel since the priority of employment during both the construction period and operation period will be given to the region.
At the present time, even if wind energy cannot answer the energy demand, usage of the wind power plants are increasing day by day. Some of the basic reasons of this increasing are low management expense and unnecessary raw material. Nowadays, mostly fossil fuels are used for electric generation. Due to these fuels have an extinction risk and they are harmful for environment, usage of the alternative energy sources become compulsory.
Wind Turbines are very important about the CO2 emission reduction. Recently Wind Power Plants become popular because of that, energy is generated with natural sources and also these plants do not cause natural source waste.
According to the calculations expected total emission reduction for chosen crediting period is 168507.01 t CO2.
The characteristics of the wind energy;

1. Wind is abundant and free in atmosphere

2. Renewable and clean energy source

3. Has a low density

5. Do not cause environmental pollution



      1. Location of project activity

        1. Host Party


Turkey

        1. Region/State/Province etc.


Barbaros WPP is located in Tekirdağ province, Turkey

        1. City/Town/Community etc.


Şarköy district of Tekirdağ



        1. Physical/Geographical location




The figure below shows the location of the project site.






Figure 1 Map and Satellite View of Project Area
Table 1 Barbaros Wind Turbines Coordinates4

Coordinate order : Right Up Datum : ED-50

Type : UTM

D.O.M. 27

Zone 35

Scaling Factor : 6 degree

Coordinate order: latitude, longitude Datum : WGS-84

Type : Geographic

D.O.M. : --

Zone : --

Scaling Factor : -----------

Point

Y

X

Y:X

T 1

523957.350

4512669.595

40.76295709:27.28335226

T 2

522761.620

4513041.084

40.76633755:27.26919894

T 3

521467.213

4513238.438

40.76815012:27.25386898

T 4

522918.342

4514509.627

40.77956246:27.27110961

T 5

524363.667

4514991.401

40.78386103:27.28825660

T 6

526163.066

4515624.094

40.78950532:27.30960869

T 7

526882.826

4516042.019

40.79324690:27.31815762

T 8

524502.975

4516924.305

40.80126923:27.28998335

T 9

525118.254

4517243.553

40.80412660:27.29729008

T 10

526372.029

4517812.396

40.80921166:27.31217775


Table 2 Switchyard Coordinates5

Coordinate order : Right Up Datum : ED-50

Type : UTM

D.O.M. :27

Zone 35

Scaling Factor : 6 degree

Coordinate order: latitude, longitude Datum : WGS-84

Type : Geographic

D.O.M. : --

Zone : --

Scaling Factor : -----------

Point

Y

X

Y:X

S 1

526643.111

4515843.224

40.79146392:27.31530777

S 2

526743.111

4515843.224

40.79146068:27.31649305

S 3

526743.111

4515743.224

40.79055984:27.31648878

S 4

526643.111

4515743.224

40.79056309:27.31530351

Total Area

10.000 m2


Table 3 Barbaros Power Plant Area Coordinates6

Coordinate order : Right Up Datum : ED-50

Type : UTM

D.O.M. :27

Zone 35

Scaling Factor : 6 degree


Coordinate order: latitude, longitude Datum : WGS-84

Type : Geographic

D.O.M. : --

Zone : --

Scaling Factor : -----------

Point

Y

X

Y:X

K 1

526372.029

4518722.979

40.81741449:27.31221620

K 2

526827.320

4518600.984

40.81630083:27.31760956

K 3

527160.617

4518267.687

40.81328740:27.32154706

K 4

527263.337

4517884.332

40.80983066:27.32274825

K 5

527607.146

4516363.955

40.79612307:27.32675733

K 6

527693.409

4516042.019

40.79322002:27.32776560

K 7

527584.811

4515636.728

40.78957266:27.32646049

K 8

527317.297

4515369.213

40.78717176:27.32327809

K 9

526529.225

4514911.623

40.78307539:27.31391838

K 10

526229.084

4514831.201

40.78236056:27.31035792

K 11

524784.259

4514565.909

40.78001540:27.29322441

K 12

524348.837

4512598.327

40.76230358:27.28798776

K 13

524312.925

4512464.304

40.76109733:27.28755709

K 14

524162.641

4512314.020

40.75974796:27.28577080

K 15

523957.350

4512259.012

40.75925840:27.28333656

K 16

523823.745

4512294.812

40.75958478:27.28175508

K 17

522678.015

4512652.903

40.76284295:27.26819430

K 18

522650.660

4512660.233

40.76290973:27.26787047

K 19

521406.253

4512844.189

40.76460011:27.25313320

K 20

521261.922

4512882.863

40.76495230:27.25142446

K 21

521111.638

4513033.147

40.76630996:27.24964893

K 22

521056.630

4513238.438

40.76816071:27.24900407

K 23

521111.638

4513443.729

40.77000865:27.24966277

K 24

521201.242

4513533.334

40.77081360:27.25072753

K 25

522442.563

4514867.920

40.78280329:27.26548410

K 26

522613.050

4515038.408

40.78433438:27.26751076

K 27

522839.091

4515098.975

40.78487378:27.27019193

K 28

523897.664

4515359.471

40.78719042:27.28274781

K 29

523697.980

4516945.158

40.80148064:27.28044121

K 30

523800.990

4517329.596

40.80494085:27.28167700

K 31

524097.684

4517626.290

40.80760500:27.28520584

K 32

524438.886

4517717.715

40.80841848:27.28925462

K 33

524904.164

4517796.771

40.80911672:27.29477407

K 34

524982.259

4517817.697

40.80930281:27.29570080

K 35

525653.685

4518337.931

40.81396864:27.30368262

K 36

525916.738

4518600.984

40.81633004:27.30681253


Wind Turbines
The capacity of Barbaros Wind Power Plant Project is 12 MW and the number of turbines is 4. The capacities of the 3 units are 3200 kW and the capacity of 1 unit is 2850 kW.
The amount of annual production is 42.000 MWh. The project is planned to connect to Tekirdağ Substation that has 34,5 kV medium voltage. Latest building technologies will be used in the project. National and international standard values will be based in used materials.7
Table 4 Technical Specifications of ENERCON E82/2.0 MW Turbines8


Turbines

GEARLESS, VARIABLE SPEED, VARIABLE AREA, CONTROLLED

Nominal generation

2000 kW

Blade diameter

82 m

Hub elevation

78-138 m

Blade Type

Upwind with active blade order

Blade number

3

Blade area

5281 m2

Operating Range

6-19,5 period/min

Direction of Rotation

Clockwise

Direction

To the wind

Blade




Material

Fiberglass with lightning protection which is supported with epoxy

Blade Connection

Steel

Generator




Power

2.0 MW

Type

ENERCON direct sliding synchronized circular generator


Table 5 Technical Specifications of MİTSUBİSHİ MWT-1000A/1.0 MW Turbines

Turbines

VARIABLE SPEED, UPWIND, HORIZANTAL AXIS

Nominal generation

1000 kW

Blade diameter

61,4 m

Hub elevation

55 m / 60 m / 69 m

Blade Type

Upwind, Horizontal Axis

Blade number

3

Blade area

19,8 period/min

Operating Range

Clockwise

Direction of Rotation

Upwind

Blade




Material

Glass Fiber Reinforced Polymer (GFRP)

Blade Connection

Steel

Lightning Sensor

Conductor

Generator




Power

1.0 MW

Type

Induction generator (with 4 polar)

Voltage

600 V / 690 V



The wind turbines like the other turbines, transform the movement of the linear fluid (air) to the rotational movement. In other, it means words transformation from the kinetic energy of the wind to the rotational mechanic energy. Obtained mechanic energy transforms to the electric energy bay way of the alternator inside of the turbine. The generated energy in one wind farm is transmitted to the switch gear and then the energy transmitted to the grid.
The lifetime of the equipment are indicated in the Barbaros WPP Project Description File as fallow:

Turbines have 20 years lifetime

Transformers have at least 20 years lifetime

      1. Technologies and/or measures




Applied approved baseline and monitoring methodology:

AMS-I.D.CM0002 “Grid-connected renewable electricity generation, version 18”

Used tools:


  • Tool for the demonstration and assessment of additionally, version 07.0.

  • Tool to calculate the emission factor for an electricity system, version 05.0.



  1   2   3   4   5   6   7   8   9   ...   23

sosyal ağlarda paylaşma



Benzer:

Project design document form for cdm project activities iconProject design document form for cdm project activities

Project design document form for cdm project activities iconProject design document form for cdm project activities

Project design document form for cdm project activities iconFor cdm project activities (f-cdm-pdd)

Project design document form for cdm project activities iconFor cdm project activities (f-cdm-pdd)

Project design document form for cdm project activities icon1. Now that formal has been given by the government, the project team can be recruited

Project design document form for cdm project activities iconBayburt coruh river watershed rehabilitation project under 3 collector...

Project design document form for cdm project activities icon“kullanıcı odaklı tasarım” (user needs design), “gerçek yaşam için tasarım” (real life design)

Project design document form for cdm project activities iconSustainable Tourism Activities Conducted in Turkey

Project design document form for cdm project activities iconA survey on supply chain and logistics management in context of design...

Project design document form for cdm project activities iconTest request form


Yasa




© 2000-2018
kişileri
d.ogren-sen.com